Let's be clear, I know nothing at all

"You Will Never Walk Alone"

Monday

Spiral Logistics - 03 889 S - Trailer

SPIRAL LOGISTICS - PROJECT NO. 10


Requested to follow through with safety adjustments.
Spec's and instruction provided by client.

Straighten out rear tail board..
Replace broken dead bolts for side pins.

Fabricate 14 x new side pins, drill holes and paint yellow.

Remove rust corrosion on the  front headboard / prime with rust block and paint white.
Clean up the sides of the load-body and paint white.

Remove rear set of steps / badly damaged
fabricate a new set of steps / RHS + LHS.
Weld new steps into place.
Paint steps yellow.

Paint yellow safety strip along both lengths of the tray.

Remove old frayed rope and strapping from timber and replace with new rope.
Secure timber to the load-body.

Repair  damaged toolbox on the LHS of the trailer.
.
Remove damaged spare wheel carrier.

Secure new fabricated mountings to the trailer for the new timber box.
Fit new timber box to trailer and touch-up with red paint.

Remove fire extinguisher mounting bracket from landing leg.

Fit new number plate LED lamp and Ally "LONG VEHICLE " sign.



Walk around video of completed Job No 10 .








Before Pictures.

Damaged rear side steps.

Damaged tool box and LHS centre steps.

Rear tail board needs straightening.


After Pictures.
Rear end cleaned up.


New signage and number plate lamp fitted.

New rear steps fabricated and fitted.

New rope to all timber bearers.

Tool box repaired , new timber box fitted to chassis.

Head board cleaned up.

Side view, new side pins fitted and steps straightened.

Bearers in place and yellow stripes painted.