Let's be clear, I know nothing at all

"You Will Never Walk Alone"
Showing posts with label Drill Rig.. Show all posts
Showing posts with label Drill Rig.. Show all posts

Wednesday

Sunward Excavator into Drill Rig Conversion.



Converting an 1.8 Ton excavator into a drill rig

Used for core samples.



Completed project to look similar to this machine.


Removing the front dipper arm.



Drill mast from a digger that needs to be modified to fit the excavator.


New foot piece fabricated and welded into place.


Mast assembly ready to be assembled to the excavator mast.


Turning new bushes and pins to suit the new boom.


Sprockets and bearings machined to run chain push-pull carriage on drill rig.


Prep still needs to be done to mount bush to new boom assembly.






Mating the drill mast and the boom assembly together.


Mountings fabricated to allow the mast x-y travel.



New excavator boom, cylinder and quick fit hydraulic hose coupling fitted.



Excavator mated to the mast assembly.



Job completed.
Excavator in travel mode.


Excavator in drill mode.


Front view of drill mode.








Monday

ATS Drill Rig - Drive Motor + Valve Bank.

Replace ATS drill rig auger drive motor.
Fit new Valve Bank.


Remove the old auger drive motor and transmission.


Remove mounting plate to fabricate new base for new drive motor.


 Machining flange to mount new drive motor.


Yoke and drive motor matched together.

 Flange spacer between motor and mast frame.


Steel hex castings machined down to size before being welded to yoke assembly.

New valve bank fitted and plumber up ( lower one)




Drive motor - flange - yoke assembly all mounted together.


 Bottom view.