Let's be clear, I know nothing at all

"You Will Never Walk Alone"

Monday

Spiral Logistics - 03 888 S - Trailer



SPIRAL LOGISTICS - PROJECT NO. 9


Requested to follow through with safety adjustments.
Spec's and instruction provided by client.

Straighten out rear damage and side rails with porter - power pack.
Replace broken dead bolts for side pins.

Fabricate 14 x new side pins, drill holes and paint white.

Remove rust corrosion on the  front headboard / prime with rust block and paint white.
Clean up the sides of the load-body and paint white.

Straighten steps and paint yellow.

Paint yellow safety strip along both lengths of the tray.

Remove old frayed rove and strapping from timber and replace with new rope.
Secure timber to the load-body.

Remove old damaged toolbox on the LHS of the trailer.
Fabricate new mountings of new toolbox supplied by the customer.
Fit toolbox to trailer.
Fit new chrome lockable locks to toolbox.

Remove damaged spare wheel carrier.

Secure new fabricated mountings to the trailer for the new timber box.
Fit new timber box to trailer and touch-up with red paint.



Walk around video of completed Job No 9 .




Before.


Old Bearer straps to be replaced.

Straps remove from trailer.


Dead bolts for side pins damaged and missing.



Remove old side pin holders.


Remove old damaged tool box.


Rear end completed.



Side view and steps repaired.


New rope fitted to load bearers.


 New Dead drop bolts fitted.


 Mountings fabricated and timber box fitted.

New tool box fitted alongside timber box.

Tool box with new chrome T locks.

New side pins fitted. Headboard cleaned up.

 Front end cleaned up and painted.

 Side view 

Timber box , RHS view.

 Reflectors, rope, drop bolts.