Let's be clear, I know nothing at all

"You Will Never Walk Alone"

Monday

SPIRAL LOGISTICS - PROJECT NO. 5

Requested to follow through with safety adjustments.
Spec's and instruction provided by client.

Fabricate rear Tail boards / removable in three sections / 750 mm high.
secure Tail boards with chain and D shekels.

Fabricate new side loading pins / weld chain to pins and secure to truck with D shekels.

Weld mesh WK 2517 to Tailboards and  prime.
Remove rust corrosion on the  front headboard / prime with rust block and paint white.

Clean up the sides of the load-body and paint white.
Straighten one set of steps and paint yellow.
Paint hand grab rail yellow and handles on the headboard.
Paint yellow safety strip along both lengths of the tray.

Secure timber to the load-body.

Walk-around inspection on completion of job.


Rear tail gate missing and damaged.

Mounting points for rear tail gates damaged , need repair.

Side safety pins missing and yellow lines faded.

Front nose damaged and looking untidy.


Front nose.

Job completion, front nose repainted.

Reflectors added and edge straightened out.

Side view of new loading pins and chains.

Headboard cleaned up and repainted. Welds repaired.

Extended tray cleaned up and painted.

New rear tailboards fabricated, holding pin tubes repaired and new chains fitted.