SPIRAL LOGISTICS - PROJECT NO. 3
Requested to follow through with safety adjustments.
Spec's and instruction provided by client.
Fabricate rear Tail boards / removable in three sections / 750 mm high.
secure Tail boards with chain and D shekels.
Fabricate new side loading pins / weld chain to pins and secure to truck with D shekels.
Weld mesh WK 2517 to front headboard and prime.
Remove rust corrosion on the front headboard / prime with rust block and paint white.
Clean up the sides of the load-body and paint white.
Straighten three sets of steps and paint yellow.
Paint hand grab rail yellow and handles on the headboard.
Paint yellow safety strip along both lengths of the tray.
Secure timber to the load-body.
Spec's and instruction provided by client.
Fabricate rear Tail boards / removable in three sections / 750 mm high.
secure Tail boards with chain and D shekels.
Fabricate new side loading pins / weld chain to pins and secure to truck with D shekels.
Weld mesh WK 2517 to front headboard and prime.
Remove rust corrosion on the front headboard / prime with rust block and paint white.
Clean up the sides of the load-body and paint white.
Straighten three sets of steps and paint yellow.
Paint hand grab rail yellow and handles on the headboard.
Paint yellow safety strip along both lengths of the tray.
Secure timber to the load-body.
Walk-around inspection on completion of job.
Steel mesh WK2517 welded to the headboard.
Steps bent straight and painted safety yellow.
New tray pins fabricated and painted safety yellow.
Yellow safety yellow stripes along the length of the tray.
Fabricate new rear tailboards , 3 off.
Clean up rear and fit tailboards.
View along the length of the tray.