Saturday

Rebuilding a Bosch VE diesel injection pump


Yes diesel heads, welcome to my friday evening activity: resealing a beautiful Bosch VE injection pump.

Note: This article does not explain how to replace the shaft bearing or how to set internal pressure. It is only a cleanup and resealing guide.

The pump is in unknown condition, so let's go for a good rebuild with disassembly, cleaning, and complete replacement of all seals.

And its just as well, it was full of crud on the inside.


01.jpg1
Here you see the starting point, a pump, seals kit with the control lever seal and driveshaft seal.As usual, all components must be clean with strict cleanliness maintained throughout. Moreover, a good lubrication of parts that push, contact, or slide is essential during the reassembly.
02.jpg2
We should not complain, a rotary pump is worse! Here it is about an hour later.I did not take pictures of the disassembly, go in reverse from what follows if you have doubts for disassembly. Important settings to record:
  1. Full load adjusting screw • See here.
  2. Speed control lever graduations • See here.
  3. Governor shaft adjustment screw • See here.
03.jpg3
Get started by doing the distributor head hydraulics, it will always be so de facto. Below are the different components of the delivery valve holder. bushing, spring, shim, needle, and new sealing washer.
04.jpg4
The copper sealing washer on the delivery valve holder.
05.jpg5
The finished distributor head.That is done, so it is time to get to the serious mechanicals.
06.jpg6
Woohoo, its competely disassembled! We see even my jeans clear through the bore.
07.jpg7
Starting with the fuel feed pump, insert the stator ring.
08.jpg8
Align 180° holes with the the pump housing taps (circled).
09.jpg9
Then the rotor and vanes.
10.jpg10
First, the rotor.
11.jpg11
then the vanes using a needlenose plier.
12.jpg12
13.jpg13
then the pressure plate.
14.jpg14
and tightened down.
15.jpg15
Assemble the driveshaft.
16.jpg16
with the governor drive gear.
17.jpg17
and two rubber dampers.
18.jpg18
then the thrust plate.
19.jpg19
and the woodruff key that drives the fuel feed pump.
20.jpg20
Insert the shaft in the pump housing.
21.jpg21
Here is the axial view.
22.jpg22
In this radial view, you can see the lozenge shaped hole for the timing control.
23.jpg23
Moving on to the next piece, the roller cage and timing pin.
24.jpg24
The correct alignment for the timing pin.
25.jpg25
An axial view of the cage positioned in the pump housing.
26.jpg26
Seen from the top.
27.jpg27
To understand how these systems interact, slide the timing pin into the crossover chamber so it protrudes into the timing cylinder. The pin controls the angular advance of the roller cage.
28.jpg28
Now slide the actuator back out to install the timing piston.This is the final position of the actuator.
29.jpg29
30.jpg30
Now we assemble the timing control piston and pivot.
31.jpg31
This piston slides back and forth in the cylinder, causing the timing pin to pivot the roller cage into advanced position.
32.jpg32
The piston is subject to two forces during normal running. On the spring side, fuel pump inlet pressure pushes it and the chamber side, the fuel pressure inside the pump housing pushes it the other way. The balance of these two pressures set the timing advance. When the inside ousing pressure is high, the timing is at maximum advance.The open end of the piston will clear the fuel pump inlet gallery.
33.jpg33
Insert the piston in the cylinder.
34.jpg34
Now push the pin down the lozenge hole.
35.jpg35
and lock with the pin.
36.jpg36
37.jpg37
Clip the pin with the retainer.
38.jpg38
39.jpg39
Cover the cylinder with the new seal.
40.jpg40
With the cover screwed on.
41.jpg41
Then on the other side, the timer spring and coldstart advance.
42.jpg42
43.jpg43
There are no controls for electrical coldstart on this car, so I put the usual cover on the cylinder.
44.jpg44
Insert the cross coupling that drives the rest of the pump.
45.jpg45
46.jpg46
Then the rollers. They are shown here in their cage outside the pump.Note the orientation of the washers, which are shaped to the inside curvature of the outer flange.
47.jpg47
48.jpg48
49.jpg49
Axial view of the rollers installed.
50.jpg50
Insert the spring in the center.
51.jpg51
The spring in position.
52.jpg52
Put the cam disk in, completing the roller cage.Timing is adjusted by the slight rotation of the roller cage relative to the camplate.
53.jpg53
Note that the plunger drive pin (circled) aligns with the woodruff key of the driveshaft.
54.jpg54
The cam lobes rolling on the cage cause the plunger to reciprocate and rotate simultaneously, building the high pressure for injection.
55.jpg55
Moving now to the distributor plunger.The spill port (circled) regulates the volume of injected fuel. When the port is open, pressure drops and injecting stops.
56.jpg56
The control collar (below), driven by the governor, adjusts the timing of the spill port.When injecting, the plunger is pushed by the cam. Depending on the position of the governor, the spill port is opened by the plunger stroke. That is the control mechanism of the fuel injection.
57.jpg57
Insert the distributor plunger in the distributor head.
58.jpg58
Then the return springs.
59.jpg59
60.jpg60
The spacer of the plunger end.
61.jpg61
62.jpg62
Insert the entire distributor head assembly into the pump, but don't tighten it down just yet.
63.jpg63
The radial view.
64.jpg64
We will now go the governor tension lever and support springs.
65.jpg65
Support springs go in these holes. This part can be a bit of a challenge getting the springs positioned.
66.jpg66
67.jpg67
The tension lever pivots on three sided bolt-hinges. I modified an old 13mm socket to fit the triangular bolts.
68.jpg68
Insertion of these bolts with new aluminum washers.
69.jpg69
Now we are installing the lever assembly from the top.
70.jpg70
To do this, remove the distributor head (which you did not bolt down) and position the lever assembly so it looks like this.Notice on the plunger shaft the spill port (green), the distributing slit (red), and four intake slits (green) extending into the high pressure chamber. The plunger is galleried to facilitate all this.
71.jpg71
The hydraulic manifold ready to assemble with the return springs.
72.jpg72
Now we are ready to install the head assembly and screw it in. This may be a bit of a challenge since the springs tend to fall out, so have some patience here.
73.jpg73
The top view.
74.jpg74
Turning now to the centrifugal governor, here are all the parts.
75.jpg75
Assemble the flyweights.
76.jpg76
Put that assembly into the rotor.
77.jpg77
78.jpg78
Replace the governor sleeve. Note the calibration hole that modulates initial injection according to load.
79.jpg79
Insert the shaft through the rotor.
80.jpg80
The governor adjustment screw.
81.jpg81
Washers between the rotor and housing.
82.jpg82
83.jpg83
Install the rotor assembly.
84.jpg84
The adjustment of this shaft is important, because it modulates initial injection according to load (along with vacuum, if so equipped). This is why it is a good idea to mark its position at disassembly.
85.jpg85
Use a hex key to screw in the shaft to the same position it was before disassembly. Use two wrenches at the same to tighten the time jam nut so the shaft is locked.Now the pump housing is complete, only needing the pump cover and the fuel pressure regulation valve.
86.jpg86
On the cover, drive out the old control shaft bushing.
87.jpg87
88.jpg88
Insert the new bushing from the inside.
89.jpg89
Use an old bolt and large washers to clamp the bushing down flush.
90.jpg90
91.jpg91
Put in the control shaft and yoke.The yoke assembly holds three springs, the governor spring, the partial-load spring and the idle damper spring.
92.jpg92
Close up of the governor linkage. Retract the rod so the flat section in the rod (green) slips into the narrow slot in the lever (red).
93.jpg93
Assemble the speed control lever with its return spring and new seal.
94.jpg94
Here you see the idle adjusting screw on the top of the picture, and the maximum speed screw at he bottom.This is one place where you need to identify the lever's setting at disassembly. Adjust it to the same graduation.
95.jpg95
The regulating valve sets the proper fuel pressure for the timing advance and fuel feed for the distributor plunger.Install it now with new seals.
96.jpg96
97.jpg97
The fuel shutoff solenoid.
98.jpg98
Notice that immediately above the solenoid is the full load adjusting screw. You may prefer to mark the setting of this screw before disassembly.
99.jpg99
Last piece, the driveshaft seal.
100.jpg100
101.jpg101
You have done it! Not as hard as you thought it would be.All that is needed now is to mount the pump!

No comments:

Post a Comment